4.5.7 - Hosted Payload

4.5.7-12 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
4.5.7-12-1 Ensure identification of all frequency ranges for which the Hosted Payload minimum radiated emission safety margin is not satisfied for the Host Vehicle Phase B | Phase C | Phase D1 | Examine potential design changes and/or more extensive EMI/EMC testing that will improve and demonstrate safety margins and compatibility for these frequency ranges. NA NA TOR-2014-02199, Guidelines for Hosted Payload Integration
4.5.7-12-2 Identify all frequency ranges for which the Hosted Payload minimum conducted emission safety margin is not satisfied for the Host Vehicle Phase B | Phase C | Phase D1 | Ensure potential design changes are examined and/or more extensive EMI/EMC testing is performed that will improve and demonstrate safety margins and compatibility for these frequency ranges. NA NA TOR-2014-02199, Guidelines for Hosted Payload Integration
4.5.7-12-3 Ensure any external portions of the Hosted Payload meet host passive intermodulation (PIM) requirements Phase B | Phase C | Phase D1 | Ensure margin established to passive intermodulation requirements. NA NA TOR-2014-02199, Guidelines for Hosted Payload Integration