4.5.7 - Hosted Payload

4.5.7-9 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
4.5.7-9-1 Ensure evaluation of the electrical design integration for Hosted Payload is completed Phase B | Phase C | Phase D1 | Ensure electrical design integration (EDI) includes review of all Electrical Ground Support Equipment (EGSE) Interfaces. Ensure all credible faults are assessed. Ensure that the power distribution for each payload is isolated and the ground schemes are safe and effective. Ensure all payloads are protected against under-voltage and overvoltage conditions. Ensure step motors and pyro circuits are isolated from other current carrying circuits. Ensure assessment of cable and harness routing and clamping design are acceptable, keeping in mind the need for possible removal and re-installation. Ensure all cable and harness interface requirements are verified. Ensure unit to unit interfaces are defined. Coordinate with EDI efforts to ensure voltage drop analyses are complete and accurate. NA NA TOR-2014-02199, Guidelines for Hosted Payload Integration