4.6 - Space Vehicle Ground Support Equipment

4.6-2 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
4.6-2-1 Ensure Electrical Ground Support Equipment (EGSE) design including units, assemblies, sub-assemblies meets the requirements Phase B | Phase C | Ensure EGSE design meets requirements by CDR NA NA Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494; Mission Assurance Guide, TOR-2007(8546)-6018, Rev B; NASA-STD-5005C, Standard For The Design And Fabrication Of Ground Support Equipment
4.6-2-2 Ensure Mechanical Ground Support Equipment (MGSE) design including units, assemblies, sub-assemblies meets the requirements Phase B | Phase C | Ensure MGSE design meets requirements by CDR NA NA Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494; Mission Assurance Guide, TOR-2007(8546)-6018, Rev B; NASA-STD-5005C, Standard For The Design And Fabrication Of Ground Support Equipment
4.6-2-3 Ensure ground support equipment software and control systems design meet the requirements Phase B | Phase C | Ensure ground support equipment software and control systems meet software development requirements NA NA NASA-STD-5005C, Standard For The Design And Fabrication Of Ground Support Equipment