Tasks | Applicable Mission Phases | Description | SFWC | Artifacts | References |
---|---|---|---|---|---|
4.6-5-1 Ensure that the as-built GSE is compliant with documented design | Phase D1 | | Ensure that item data package review is conducted of the end product, design schematics, and test results. Ensure the support equipment is fully interoperable and compatible with the system. | AFMAN 63-119 A25.3 | NA | Mission Assurance Guide, TOR-2007(8546)-6018, Rev B; AFMAN 63-119 or equivalent |