4.6 - Space Vehicle Ground Support Equipment

4.6-8 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
4.6-8-1 Ensure adequacy of GSE testing Phase C | Phase D1 | Ensure review of all verification and corrective action data for all development hardware and software test data. Ensure the government has positive control or oversight of support equipment configurations. AFMAN 63-119 A25.3.2 NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Integration, Test and Evaluation chapter; AFMAN 63-119 or equivalent
4.6-8-2 Ensure GSE has met all of its requirements and evidences are documented Phase D1 | Ensure that unit-to-bus system level testing verifies performance at temperatures and other environmental extremes at all levels of testing. Ensure that unit level testing stresses the unit as built to reveal issues at the lowest level of build and test. Ensure verification progress is tracked using the verification ledger/matrix. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Integration, Test, and Evaluation Chapter
4.6-8-3 Ensure all GSE anomalies and failures are documented and dispositioned in accordance with approved processes Phase D1 | Ensure that all components related to the anomaly are evaluated for overstress, including Acceptance Data Packages, Qualification Test Reports and raw test data when available. Ensure that any cross-program systemic issue is submitted to problem alerting processes. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, ITE chapter.