4.8 - Launch System Integration

4.8-1 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
4.8-1-1 Ensure that the launch system integration management plan is reviewed and complete Phase A | Phase B | Phase C | Phase D1 | Ensure plan is reviewed for risk identification for cost, schedule, performance and technology. Ensure risks are identified early and at the lowest level. Check that the risk mitigation plans are sufficient, risk handling measures are planned, funded, executed and completed at the right time. SFWC 4.13 NA Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494; Mission Assurance Guide, TOR-2007(8546) Rev B
4.8-1-2 Ensure lessons learned for applicability to LSI and incorporation into entire LSI process are reviewed Phase A | Phase B | Phase C | Phase D1 | Ensure lessons learned databases are reviewed and applied, as appropriate. Ensure interface exists to problem alerting databases, including surveillance of system for relevant alerts. SFWC 4.13 NA Why Satellites Fail: Lessons for Mission Success, TOR-2009(8617)-8704