5.2.2 - Ground Segment Supportability

5.2.2-2 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
5.2.2-2-1 Ensure current configuration baseline is maintained and available for review Phase 0 | Phase A | Phase B | Phase C | Phase D1 | Phase D2 | Phase D3 | Ensure the configuration baseline is updated to reflect all changes resulting from ongoing facility projects, based upon as-built drawings from construction contractor at project closeout. NA System/Segment Specification (SSS) Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Configuration Management Chapter
5.2.2-2-2 Ensure Preventive Maintenance follows manufacturer's recommendations Phase 0 | Phase A | Phase B | Phase C | Phase D1 | Phase D2 | Phase D3 | Ensure Preventive Maintenance Procedures based on operations & maintenance manuals are submitted upon project closeout. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Operations and Sustainment Chapter
5.2.2-2-3 Ensure risk identification management processes include supportability Phase 0 | Phase A | Phase B | Phase C | Phase D1 | Phase D2 | Phase D3 | Ensure operations, maintenance and sustainment risks are included as part of the overall program risk and opportunity management process. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Operations and Sustainment Chapter
5.2.2-2-4 Ensure Continuity of Operations (COOP) plans and processes are in place Phase 0 | Phase A | Phase B | Phase C | Phase D1 | Phase D2 | Phase D3 | Ensure normal and abnormal failure and develop recovery plans and procedures are developed. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Operations and Sustainment Chapter
5.2.2-2-5 Ensure development of a list of long lead items and methodology for assuring "on-time" delivery Phase 0 | Phase A | Phase B | Phase C | Ensure long lead items are addressed early in the acquisition and develop a plan. Long-lead includes permissions and agreements as well as materials. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, PMP Chapter
5.2.2-2-6 Ensure non-conforming Parts/Materials/Processes (PMP) and Maintenance Review Board (MRB) decisions are adequate and reviewed and approved by a PMP Control Board (PMPCB) Phase 0 | Phase A | Phase B | Phase C | Phase D1 | Phase D2 | Phase D3 | Ensure Parts/Materials/Processes (PMP) non-conformance issues are addressed at a technical review board with adequate visibility, oversight processes, and configuration controls. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, PMP Chapter
5.2.2-2-7 Ensure actual designs and application impacts on Parts/Materials/Processes (PMP) are not exceeding limitations Phase 0 | Phase A | Phase B | Phase C | Phase D1 | Phase D2 | Phase D3 | Ensure analysis of design and applications for Parts/Materials/Processes (PMP) limitations. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, PMP Chapter
5.2.2-2-8 Ensure Bill Of Materials is traceable to approved and as-designed parts lists Phase 0 | Phase A | Phase B | Phase C | Phase D1 | Phase D2 | Phase D3 | Ensure parts heritage is audited. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, PMP Chapter
5.2.2-2-9 Ensure Parts/Materials/Processes (PMP)-related fielding and checkout activities and processes assure that performance expectations are met, technology and performance upgrade opportunities are identified, and system anomaly corrective actions/Lessons Learned are resolved and implemented Phase D1 | Phase D2 | Phase D3 | Ensure Parts/Materials/Processes (PMP) requirements are tested, PMP is address in Risk and Opportunity process, and PMP lessons learned are followed up. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, PMP Chapter; Why Satellites Fail: Lessons for Mission Success, TOR-2009(8617)-8704
5.2.2-2-10 Ensure expected failure rates during production and operations is adequately accounted for in the maintenance and spares plan Phase D1 | Phase D2 | Phase D3 | Ensure reliability assessments are made and are inputs to the maintenance and spares plan. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Operations and Sustainment, and Reliability Engineering chapters