5.2.2 - Ground Segment Supportability

5.2.2-3 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
5.2.2-3-1 Ensure supportability requirements adequately support higher-level system requirements Phase A | Phase B | Phase C | Phase D1 | Phase D2 | Ensure supportability requirements are traceable from item to system level requirements. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Requirements Development, Validation, and Verification Chapter
5.2.2-3-2 Ensure supportability is addressed in contractor's sustainability plan Phase B | Phase C | Phase D1 | Phase D2 | Ensure contractor sustainment plan includes approach to meeting supportability requirements. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Operations and Sustainment Chapter
5.2.2-3-3 Ensure supportability is addressed in contractor's maintenance plan Phase B | Phase C | Phase D1 | Phase D2 | Ensure contractor maintenance plan includes approach to meeting supportability requirements. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Operations and Sustainment Chapter
5.2.2-3-4 Ensure supportability is addressed in contractor's Reliability, Availability, Maintainability (RAM) report (metrics) Phase B | Phase C | Phase D1 | Phase D2 | Ensure contractor reports Reliability, Availability, Maintainability (RAM) metrics to validate operations, maintenance and sustainment plans, and any supportability Technical Performance measures. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Reliability Engineering Chapter
5.2.2-3-5 Ensure supportability is addressed Configuration Management/Data Management plan Phase A | Phase B | Phase C | Phase D1 | Phase D2 | Ensure contractor Configuration Management/Data Management plan includes approach to meeting supportability requirements. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Configuration Management Chapter
5.2.2-3-6 Ensure contractor is in compliance with Base environmental plan Phase A | Phase B | Phase C | Phase D1 | Phase D2 | Ensure base environmental requirements are included in safety, maintenance, and sustainment planning. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, System Safety Assurance Chapter
5.2.2-3-7 Ensure supportability is addressed in contractor's systems engineering management plan (SEMP) Phase A | Phase B | Phase C | Phase D1 | Phase D2 | Ensure contractor systems engineering management plan includes approach to meeting supportability requirements. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Requirements Development, Validation, and Verification Chapter
5.2.2-3-8 Ensure that all Parts/Materials/Processes (PMP) required contractor tasks and deliverables have been placed on contract Phase A | Ensure assessment of pre-award model contract CDRL/DIDs and SOW. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, PMP Chapter
5.2.2-3-9 Ensure contractor's Parts/Materials/Processes (PMP) Control Program Plan is documented and complete Phase A | Phase B | Phase C | Phase D1 | Phase D2 | Ensure the Parts/Materials/Processes (PMP) Control Program Plan describes how the contractor's (and all subcontractor's) practices, processes, and procedures implement management and technical requirements and controls. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, PMP Chapter
5.2.2-3-10 Ensure that documented individual part, material, or process needs are consistent with PMP program requirements Phase A | Ensure program-level PMP requirements flow down to individual parts, materials, and processes. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, PMP Chapter