5.2.2 - Ground Segment Supportability

5.2.2-5 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
5.2.2-5-1 Ensure facility is designed for maintenance while operated and occupied Phase A | Phase B | Phase C | Ensure appropriate experts are engaged in iterative facility design process. NA NA Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Operations and Sustainment Chapter
5.2.2-5-2 Ensure facility life cycle cost analysis includes supportability considerations Phase A | Phase B | Phase C | Ensure supportability considerations (economic, Leadership in Energy and Environmental Design (LEED), etc.) are specified in the life cycle cost analysis acquisition documentation. NA NA UFC 3-400-01 5 July 2002 Including Change 4, August 2008