5.2 - Ground Segment System Engineering, Integration & Test (SEIT)

5.2-2 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
5.2-2-1 Ensure that all ground segment risks for cost, schedule, performance, and technology are identified and have a mitigation plan Phase A | Phase B | Phase C | Phase D1 | Phase D2 | Ensure risks are identified early and at the lowest level. Check that the risk mitigation plans are sufficient, risk handling measures are planned, funded, executed and completed at the right time. NA Risk Management Plan; Systems Engineering Management Plan (SEMP) Space Vehicle Systems Engineering Handbook, TOR-2006(8506)-4494; Mission Assurance Guide, TOR-2007(8546)-6018, Rev B