5.2 - Ground Segment System Engineering, Integration & Test (SEIT)

5.2-4 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
5.2-4-1 Ensure identification of new or changed designs Phase B | Phase C | Phase D1 | Ensure that any new designs or changed /upgraded designs meet design review criteria. NA NA Mission Assurance Guide, TOR 2007(8546)-6018
5.2-4-2 Ensure application of the design and verification guidelines for each changed area Phase B | Phase C | Phase D1 | Ensure that any new designs or changed /upgraded designs meet design review criteria. NA NA Mission Assurance Guide, TOR 2007(8546)-6018