5.6 - Ground Segment Facilities

5.6-2 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
5.6-2-1 Ensure design complies with Base Excellence Standards (if building on a military installation) Phase A | Phase B | Phase C | Ensure compliance to unique military installation standards for architecture, finishes, and infrastructures systems, etc. NA System/Segment Specification (SSS); Design Review Data Package Provided by Base Civil Engineering (Base CE)
5.6-2-2 Ensure infrastructure systems architecture satisfies user Concept of Operations (CONOPS) Phase A | Phase B | Phase C | Ensure architecture satisfies user operational requirements. NA System/Segment Specification (SSS); System CONOPS; Design Review Data Package Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Requirements Development, Validation, and Verification Planning