5.6-5-1 Ensure development of retro commissioning plan meets system performance requirements |
Phase B |
Phase C |
|
Ensure design reviews are held in accordance with the reference
|
NA
|
Design Review Data Package
|
Air Force Document (AFD) -070919-027 (6.2-3) or equivalent; Unified Facilities Criteria (UFC) 4-030-01
|
5.6-5-2 Ensure test planning is in compliance with prevailing standards |
Phase B |
Phase C |
|
Ensure the design reviews in accordance with the references
|
NA
|
Integration and Test Plans
|
Air Force Document (AFD) -070919-027 (6.2) or equivalent
|
5.6-5-3 Ensure test planning is in compliance with user specific standards |
Phase B |
Phase C |
|
Ensure design reviews are held in accordance with the user needs and requirements. Reference user specific standards (Mil-specifications, etc.)
|
NA
|
Integration and Test Plans
|
Air Force Document (AFD) -070919-027 (6.2) or equivalent
|
5.6-5-4 Ensure test planning is compliant with test requirements defined in the requirements document |
Phase B |
Phase C |
|
Ensure design reviews are held in accordance with the reference
|
NA
|
Integration and Test Plans
|
Air Force Document (AFD) -070919-027 (6.2) or equivalent; Unified Facilities Criteria (UFC) 1-200-01 (General Building Requirements)
|