5.6 - Ground Segment Facilities

5.6-5 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
5.6-5-1 Ensure development of retro commissioning plan meets system performance requirements Phase B | Phase C | Ensure design reviews are held in accordance with the reference NA Design Review Data Package Air Force Document (AFD) -070919-027 (6.2-3) or equivalent; Unified Facilities Criteria (UFC) 4-030-01
5.6-5-2 Ensure test planning is in compliance with prevailing standards Phase B | Phase C | Ensure the design reviews in accordance with the references NA Integration and Test Plans Air Force Document (AFD) -070919-027 (6.2) or equivalent
5.6-5-3 Ensure test planning is in compliance with user specific standards Phase B | Phase C | Ensure design reviews are held in accordance with the user needs and requirements. Reference user specific standards (Mil-specifications, etc.) NA Integration and Test Plans Air Force Document (AFD) -070919-027 (6.2) or equivalent
5.6-5-4 Ensure test planning is compliant with test requirements defined in the requirements document Phase B | Phase C | Ensure design reviews are held in accordance with the reference NA Integration and Test Plans Air Force Document (AFD) -070919-027 (6.2) or equivalent; Unified Facilities Criteria (UFC) 1-200-01 (General Building Requirements)