5.6 - Ground Segment Facilities

5.6-6 Level 2 Tasks

Tasks Applicable Mission Phases Description SFWC Artifacts References
5.6-6-1 Ensure factory acceptance testing is specified for all major equipment Phase B | Phase C | Phase D1 | Ensure that specifications call-out Facility Acceptance Tests. Ensure design reviews are held in accordance with the references. Major/critical equipment includes the infrastructure for power, heating, ventilation, air conditioning, including uninterruptible power supply, switchgear, chillers, air handlers, etc. NA Integration and Test Plans; Design Review Data Package Unified Facilities Criteria (UFC) 1-200-01 (General Building Requirements)
5.6-6-2 Ensure tested performance meets retroactive commissioning criteria Phase D1 | Ensure existing facilities are considered as part of this activity. Retroactive commissioning takes into account original design and the changes made throughout the development activity. NA NA Unified Facilities Criteria (UFC) 3-400-01 (Energy Conservation)
5.6-6-3 Ensure testing satisfies accepted test plan criteria and is in accordance with prevailing code & standards requirements Phase D1 | Ensure review of test plans/procedures and participation in the test procedure and review test results. NA NA Unified Facilities Criteria (UFC) 1-200-01 (General Building Requirements)
5.6-6-4 Ensure testing meets accepted test plan and is in accordance with user-specified criteria/standards Phase D1 | Ensure review of test plans/procedures and participation in the test procedure and review test results. NA NA Unified Facilities Criteria (UFC) 1-200-01 (General Building Requirements)
5.6-6-5 Ensure testing results meet facility requirements criteria Phase D1 | Ensure review test of plans/procedures and participation in the test procedure and review test results. NA NA Unified Facilities Criteria (UFC) 1-200-01 (General Building Requirements)