8-19-1 Ensure evaluation of problem report severity and rate of ground system |
Phase D2 |
Phase D3 |
|
Ensure repair rate, build-up of critical problems which affect overall operations, and recurrence of previously detected and repaired problems are included.
|
SFWC 2.2.4
|
NA
|
Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Operations Readiness and Mission Operations & Sustainment Chapters
|
8-19-2 Ensure evaluation of mission processing |
Phase D2 |
Phase D3 |
|
Ensure evaluations include long-term analyses and subsequent recommendations to the procuring command for future space or ground improvements.
|
SFWC 2.2.4
|
NA
|
Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Operations Readiness and Mission Operations & Sustainment Chapters
|
8-19-3 Ensure evaluation of space vehicle and payload state-of-health data |
Phase D2 |
Phase D3 |
|
Ensure evaluations include long-term analyses and subsequent recommendations to the procuring command for future space or ground improvements.
|
SFWC 2.2.4
|
NA
|
Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Operations Readiness and Mission Operations & Sustainment Chapters
|
8-19-4 Ensure space vehicle and ground segment performance |
Phase D2 |
Phase D3 |
|
Ensure program office engineers provide anomaly support, and collection of anomaly data for subsequent cross-program analyses. During EOT and throughout space vehicle life, performance of both space and ground segments should be collected, evaluated, and reported.
|
SFWC 2.2.4
|
NA
|
Mission Assurance Guide, TOR-2007(8546)-6018, Rev B, Operations Readiness and Mission Operations & Sustainment Chapters
|
8-19-5 Ensure flight and/or field anomaly data collection plan is developed |
Phase D2 |
Phase D3 |
|
NA
|
SFWC 2.2.4, SFWC 2.2.4.1
|
NA
|
NA
|
8-19-6 Ensure trending analysis of critical parameters is performed |
Phase D2 |
Phase D3 |
|
NA
|
SFWC 2.2.4, SFWC 2.2.4.2
|
NA
|
NA
|